For the stadium's new EPMS system, Affinity Energy proposed VTSCADA hosted on a high-availability virtual machine that the stadium maintains. The system has full data logging, trending, alarming, and alarm notifications.

Mercedes-Benz Stadium

Constructed in 2017, the 71,000-seat Mercedes-Benz Stadium is the newest NFL stadium and official home of the Atlanta Falcons and United FC. A tight construction schedule meant Mercedes-Benz Stadium’s electrical power management system was removed from the original building contract. However, once the stadium was completed, they needed an EPMS up and running in just two months.

What Our Clients Say About Us

AE_Icon_Quote

Thanks to Affinity Energy’s efforts and commitment, the construction team was able to complete the project on schedule. Allan, Zack and Victor went above and beyond to ensure that they delivered an outstanding product, in spite of challenging circumstances.

Mihai Sterescu

Vice President at Barnett Consulting Engineers

Challenge

Due to the sophistication of its audio and visual experiences, Mercedes-Benz Stadium houses a small, onsite data center to handle high-power computing and video processing, including the 63,000 sq. ft. 360-degree video board, 2,000 video displays, 90 miles of audio cabling, and thousands of Wi-Fi access points.

Mercedes-Benz Stadium needed an electrical power management system (EPMS) to ensure computing continuity to control stadium lights and broadcasts during events. Specifically, they needed the EPMS to:

  • Confirm that the electrical distribution system does not have any malfunctions that could impact operation of the servers and supercomputer.
  • Verify A and B-side weekly generator testing.
  • Manage connection of new equipment to the electrical distribution to prevent overload if the A or B side is lost.

The EPMS needed to integrate a diverse range of equipment manufacturers, including Kohler generators, ASCO & Kohler ATS, Eaton UPS, E&I/Socomec Busway, and LayerZero PDU and RPPs.

Because the stadium was preparing for an integrated system test (IST) with a fixed date due to several very large upcoming events at the stadium, (including the 2019 Superbowl LIII, College Football 2018 SEC Div I Football Championship game, a Taylor Swift concert, and Ed Sheeran concert) the project needed to be designed, developed, and installed in less than two months.

Solution

Results

Affinity Energy’s EPMS system passed with flying colors during the three IST tests on November 14:

  • First, the testers created a complete utility power outage. In this scenario, both A and B side ATS sensed the loss of normal power and signaled the A and B generators to start. Both A and B side UPSs ensured continuity of electric power until the generators were at voltage and frequency. The ATS then transferred from normal source to emergency source, and data center functions operated business as usual. During this process, all of the different equipment vendors, including Affinity Energy, performed a series of checks to verify their respective systems operated as designed.
  • Second, the testers purposely failed the A side normal power to ensure the B side of electrical distribution could support all the critical equipment. While the generator and UPS operated as designed, the EPMS also accurately tracked events and alarms and recorded trends that tracked the loads on the B side of the electrical distribution.
  • Lastly, the testers purposely failed the B side to ensure the A side could carry the load as designed.

During the IST, the EPMS system was displayed in the security control room and data center. Testers could view the system in real-time and confirm the sequence of events as they occurred. As tests were conducted, they could witness the equipment responding as designed. Participants were impressed with the amount of system details Affinity Energy integrated in just two months, and how well organized it was so that even those who did not have in-depth electrical knowledge could follow along.

“It was a great team effort,” according to Allan Evora, the owner of Affinity Energy and project manager for this special project. While Affinity Energy’s data center EPMS expertise was a significant factor, meeting the project deadline was made possible by the tremendous support Affinity Energy received from the owner, the consulting engineer, the electrical contractors, and the commissioning agent.

Because the VTSCADA system is on the stadium’s network, it can easily support expansion as the stadium’s electrical power and energy needs grow.